Process

Four steps, no surprises.

The budget is fixed at design, the crew is ours, and the schedule is one project at a time. Most builds run one to six weeks on site.

01

Site Visit

We walk the property, read grade and drainage, find power and water, and talk through how you want to use the space. Usually an hour, no charge.

  • Grade, drainage and soil assessment
  • Sight lines from the house and terrace
  • Access for equipment and stone
  • Honest budget range before you commit
02

Design

Layout, depth, stone selection and equipment specified against a fixed budget. You see the plan and the numbers before anything is dug.

  • Plan and section drawings
  • Filtration and turnover calculations
  • Stone and material selection
  • HOA and permit packet where required
03

Build

Our own crew excavates, plumbs, sets boulders by hand and commissions the system. The site is protected and cleaned daily.

  • Excavation and haul-off
  • Liner, plumbing and equipment vault
  • Hand-set stone and edge concealment
  • Electrical, lighting and inspection
04

Balance & Care

We cycle the ecosystem, introduce fish and plants, and walk you through the system until it makes sense. Then we stay on for seasonal service.

  • Biological cycling and water chemistry
  • Fish and plant introduction
  • Owner walkthrough and documentation
  • Seasonal maintenance plan

Start a Project

Tell us about the property.

Consultations are on site and typically an hour. You'll leave with a realistic budget range and no obligation.