Custom koi pond built for a Highland Park, Texas property

Service Area · Highland Park, Texas

Koi ponds & water features in Highland Park.

We design and build permanent water for Highland Park properties — engineered filtration, hand-set stone and edges that never show a liner. Most projects run $15,000 to $80,000 and up.

Building in Highland Park

Local soil, grade and sun decide how a pond has to be built.

North Texas clay moves with the seasons and full afternoon sun drives algae hard from June through September. In Highland Park we build at depth, size filtration to the fish load rather than the surface area, and set the perimeter stone so the edge disappears into the existing hardscape. Where a lot slopes, the feature does the drainage work too.

HOA and permit submittals are prepared during design, so approvals run in parallel with scheduling instead of delaying the dig.

Ground conditions in Highland Park

What the ground here does to a pond build.

Where we work
The Town proper, Armstrong and Beverly.
What is different here
Access is the defining constraint. Many of these lots have no route for a mini-excavator between the house and the boundary, which means spoil and stone move by wheelbarrow. That single fact can move a build estimate more than the pond's size does.
Surface geology
Blackland Prairie clay over Austin Chalk — dense, high-plasticity ground that can exceed 60% clay.
Excavation
Clay costs machine hours at both extremes: sticky and uncompactable wet, near-concrete dry.
Water supply
Town of Highland Park utility on Dallas-supplied surface water, so the same chloramine conditioning rule applies.
Property character
Small, highly designed lots with significant hardscape already in place and architectural review on any visible change.
Permits & barriers
Highland Park's review process is unusually involved for visible exterior work — the town, not just an HOA.

Start a Project

Start a Highland Park project.

Consultations are on site and typically an hour. You'll leave with a realistic budget range and no obligation.